The very first Closed Coke Slurry System was installed at a German refinery in the 90’s. Over the years this initial design was modified, components and materials altered, specific equipment changed. The last modifications
were implement during a DCU shut down in 2005 and ever since the unit has been running trouble free. It is with great pride we can state the engineers involved in these modifications and improvements are all employed by Triplan The refinery
reports over this 10 year operation; no dedicated field operators required, high reliability factors, uninterrupted operation equivalent to 5000 cycles, no deterioration of slurry pump performances, no corrosion and erosion of the total
CCS system, no fire, no accidents, no ‘near miss’ incidents, free water content of commercially dry coke lower 10% .
More details about the CCSS, including case studies and downloads can be found on triplantec.com/technology.